RCBC Plaza is the biggest and most modern office development in the Philippines today.
 
 
 
 

Number of Floors

  Yuchengco Tower : 46
  Tower 2 : 41

Internal Finishes

  Main Lobby and Elevator Lobbies
 
  • Granite and marble to walls and floors
  Standard Office Floors
 
  Floor : Power float finish
Plaster and paint to core walls and columns
  Walls : Plasterboard and paint to inside face of curtain wall

External Finishes

  • Aluminum panels with fluorocarbon paint finish to towers
  • Curtain wall of clear and solar reflective glass
  • Stone cladding to podium

Column to Column Centers

  • 9 meters longitudinal
  • 6 meters transverse

Wall to Core Wall Distance

12 meters average

Clear Ceiling Height

  Typical Floor : 2.7 meters
  Ground Lobbies : 7.9 meters

Floor Loading

4.4 kPa live load including partitions

Raised Floor

Structural capacity to take raised floor of 50 kg/square meter is provided to every typical office floor.

Electricity

Supply is obtained from Meralco. Supplemented by 100% back-up genset of 14.8 MW capacity.

Internal Staircase

Provision has been made for the creation of inter-tenancy staircase between tenancy floor.

Pantries

Common pantry room is available on each floor. In addition, separate water supply and drainage tee-off points can be made available for future installation of private pantries by tenants.

Air Conditioning

An advanced central chilled water air conditioning system with air handling units to each floor and provision for Variable Air Volume (VAV) control system. Cooling load is 200 sq. ft. per ton for a population density of 10 square meters per person.

Lighting

Provision for 100 lux at desk level, fully recessed.

Telecommunications

  • Telephone system : Provision for 20,000 telephone lines are provided for allocation to tenants.
  • Fiber Optic and Category 3 cable risers for voice, data and digitized video transmission.

Computer

  • Via Fiber Optic riser. Conduits for horizontal distribution are provided.
  • A clean computer earthing system is provided inside the telecom riser shaft.
  • 24-hour chilled water supply tee-off is available to feed tenants' computer cooling unit requirements.

Elevators

  Yuchengco Tower    
  Low Rise : 3 units 1150 kg at 2.5 m/s
    : 3 units 1150 kg at 3.5 m/s
  Mid Rise : 8 units 1150 kg at 4.0 m/s
  High Rise : 4 units 1150 kg at 5.0 m/s
    : 4 units 1150 kg at 6.3 m/s
  Service Elevator : 1 unit 2000 kg at 5.0 m/s
  Executive Floor : 1 unit 800 kg at 6.3 m/s
       
  Tower 2    
  Low Rise : 5 units 1600 kg at 2.5 m/s
  Mid Rise : 6 units 1600 kg at 3.5 m/s
  High Rise : 6 units 1600 kg at 5.0 m/s
  Service Elevator : 2 units 2000 kg at 3.5 m/s

Podium Elevators / Escalators

  Elevators : 4 units 1600 kg at 2.5 m/s
  Escalators : 2 sets 1200 mm reversible at 0.5 m/s

Carpark

Provision for 1,670 parking slots (basement parking)

Building Automation System

An advanced computer-based BAS controls / monitors the efficient operation of all building services.

Security

24-hour centralized surveillance system with Closed Circuit Television (CCTV) and a comprehensive computerized monitoring system.

Fire Protection and Detection

The building is protected by fire detection and protection systems complying with NFPA and local codes.

Structural Safety

Earthquake and wind load resistance are designed with respect to relevant international standards and wind tunnel testing.

 